EV charging civils at a commercial or industrial site
Commercial & industrial · UK wide

EV infrastructure starts below the surface.

Trenching, ducting, charger bases, feeder routes, bay preparation and careful reinstatement.

The work

The civils behind reliable charging.

A charging installation is only as practical as its cable routes and finished ground. We deliver the civils package around the electrical design: trenches, ducts, foundations, protection and reinstatement across commercial sites.

Trench routes and charger bases have to fit the electrical design, existing services and the surface that will be handed back.

Explore the scope
EV charging civils work at a UK commercial site
Orange electrical ducts laid in a protected trench across a commercial car parkThe work in detail
On a working site

Get the route right before the charger.

Commercial charge points need a route from the electrical supply to each charger position. The civils scope covers safe excavation, ducts and chambers, equipment foundations, bay interfaces and reinstatement. It should follow the electrical designer’s route, cable requirements and charger manufacturer details.

Route coordination

Existing utilities, trench crossings and the electrical design determine where ducts and chambers can sensibly go.

Equipment bases

Charger plinths and protection details need the correct dimensions and positions from the selected equipment.

A usable finish

Reinstatement should restore vehicle and pedestrian movement around bays, kerbs and accessible routes.

Scope of work

The work, in detail.

Final quantities, specifications and design responsibilities are agreed from the information for each site.

Cable trenching

Excavation and preparation for agreed feeder routes between supply, distribution and charge points.

Ducting and chambers

Duct routes and access arrangements to the project specification and coordination requirements.

Charger foundations

Concrete pads and plinth preparation for charging equipment, subject to manufacturer details.

Reinstatement and dressing

Surface make good, kerb and bay interfaces and a clean finish around the completed civils package.

Start with a useful brief

What to send us.

Share charger quantities, site plan, supply location and electrical contractor details. We can coordinate the civils scope around those interfaces.

  • Site and bay layout
  • Proposed supply position and cable route
  • Charger type, quantities and foundation details
  • Operating hours and permitted work zones
Common questions

Before work begins.

Do you supply the EV chargers?

This page covers the civils work. Charger supply and electrical installation can be coordinated with the appointed specialist and agreed project scope.

Can trenches cross an active car park?

They can be assessed for a phased approach. Existing services, customer access and safe segregation shape the plan.

Discuss EV charging civils

Show us the plan.
Let’s shape the work.

Tell us the location, the work and your target dates. Drawings and measurements help, but a short description is enough to begin.

Call 0208 050 7207
Project enquiry

Send your project brief.

Share what you know about the site and we’ll take it from there.

Prefer a call? 0208 050 7207

Call nowRequest a quote